|
Subseries III.D.4. Apollo Follow-On Programs |
|
As originally planned the Apollo Program was an initial reconnaissance of the lunar surface to be followed by more intensive exploration of the moon and experimentation in lunar and Earth orbit. This second phase was to use the Apollo spacecraft system as its basis, with added capability provided by additional vehicles and technology. NASA initiated a series of studies in 1962 examining various aspects of the Apollo follow-on exploration/experimentation regime to be instituted in the late-1960s/early-1970s time frame. By late 1964 the various studies had been organized as the Apollo Extension System (AES). AES still envisioned a combination of lunar surface, lunar orbit, and earth orbit missions lasting up to 120 days (six months). Geared toward utilizing Apollo-era hardware as much as possible, it examined the possibilities of using spent Saturn stages as orbital workshops (OWS) or lunar surface bases. In August 1965 AES was placed under the control of the Saturn/Apollo Applications Office and a month later was renamed the Apollo Applications Program (AAP). Over the next several years AAP was progressively reduced in response to budget cuts. The lunar surface missions, as immediate follow-on to the Apollo landings, were the first missions to be cut. The earth orbital missions (OWS) were also pared back. In mid-1969 NASA inherited the food/diet and spacesuit contracts and the astronauts from the Defense Department's cancelled Manned Orbital Laboratory (MOL) program. Despite this addition, in July 1969 AAP was cut to a single OWS launch and three manned missions. In February 1970 the AAP program was renamed Skylab. The material in this subseries relates to NASA studies conducted under AAP and its predecessors, both as an organized program and as separately-funded study contracts. Materials relating to early development work on Skylab systems and operations as well as materials relating to Skylab as named, are included with materials on earth orbital projects as subseries III.D.4.g. (Earth Orbital Program Studies/Skylab). For documents relating to NASA's post-Apollo programs, including the Manned Orbital Research Laboratory (MORL) and space station programs, see subseries III.D.5. (Space Station Programs). For documents relating to NASA's planned manned interplanetary program, including studies involving the use of Apollo and Saturn hardware for interplanetary missions, see subseries III.D.6. (Manned Interplanetary Concepts) The materials in this subseries are grouped into subseries by topic. Unless otherwise noted, documents are arranged chronologically by study within each subseries.
| ||
| Box | Folder | |
|
This subseries consists of documents pertaining to space exploration in the general context of Apollo follow-on exploration. | ||
| 99 | 5 | "Astronautics Information." Utilization of Extraterrestrial Resources [Seminar Proceedings]. (JPL. September 25-26, 1962.) | 6 | Recommendations for Utilization of Lunar Resources - A Report of the Working Group on Extraterrestrial Resources [Seminar Proceedings]. (JPL. March 8, 1963.) |
7 | Manned Space Flight Network Augmentation Study for the Apollo Extension System. [Report.] Part I. Tracking and Data Systems Directorate. (GSFC. September 1, 1965.) |
8 | "Apollo Applications Program - A Bibliography." (Extraterrestrial Research Center. April 1966.) [folder 1 of 3] |
9 | [folder 2 of 3] |
10 | [folder 3 of 3] |
11 | "The Space Program in the Post-Apollo Period - A Report of the President's Science Advisory Committee." (The White House. February 1967) |
| 100 | 1 | "America's Next Decades in Space - A Report for the Space Task Group." (NASA. September 1969) | 2 | "The Post-Apollo Space Program: Directions for the Future." (Space Task Group Report to the President. September 1969) | 3 | "Apollo Lunar Exploration Program Science Objectives and Mission Plans" [presentation graphics and outline]. (Bellcomm, Inc. September 1969) | 4 | "The Next Decade in Space - A Report of the Space Science and Technology Panel of the President's Science Advisory Committee." (Office of Science and Technology, Executive Office of the President. March 1970) |
|
Subseries III.D.4.b. Apollo Spacecraft Design Modifications The documents in this subseries relate to modifications suggested to the Apollo Command/Service Module (CSM) or other Apollo system spacecraft for the various Apollo follow-on missions. | ||
| 100 | 5 | Preliminary Definition Study for Utilization of CSM for AES. Experiment Identification Descriptions. (NAA/SID. December 1965.) Volume 2: Behavioral Experiments (SID 65-1537-2.) | 6 | Volume 3: Physical Science Experiments (SID 65-1537-3.) [folder 1 of 2] |
7 | [folder 2 of 2] |
8 | Land Landing System. (NAA/SID. 18 February 1966.) Technical Summary (SID 65-1544-1.) [folder 1 of 2] |
9 | [folder 2 of 2] |
| 101 | 1 | CSM Study for Apollo Applications. Bimonthly Summary Report. (NAA/SID. 13 March 1967.) Volume 3: Task 4.1: Mission Analysis (SID 67-54-3.) | 2 | "Evaluation of Apollo Oxygen Cryogenic Storage System for Apollo Applications Program Missions." (David R. Saucier Jr; MSC/TTB. Internal Note MSC-EP-R-67-30. December 15, 1967) | 3 | "Selected Discussion on Manned Spacecraft Advanced Hardware Development Current Status and Plans." (MSC. April 25, 1968.) [copy 1 of 2] |
4 | [copy 2 of 2] |
|
Subseries III.D.4.c. Experiment Design The materials in this subseries relate to the design and selection of experiments for Apollo follow-on exploration. | ||
| 101 | 5 | Apollo Logistics Support System Scientific Mission Support Study (Study of Sample Experiments for Engineering Design Purposes). Final Report. (Bendix/BSD. BSR-1112. March 1965.) Summary. | 6 | [Part I]. [folder 1 of 2] |
7 | [folder 2 of 2] |
8 | [Part II]. [folder 1 of 2] |
| 102 | 1 | [folder 2 of 2] | 2 | Scientific Mission Support Study - Apollo Extension System. Final Report. (Bendix/BSD. BSR-1207. November 1965.) Volume I: Summary. |
3 | Volume II. [folder 1 of 2] |
4 | [folder 2 of 2] |
5 | "Lunar Surface Exploration - Identification and Description of Proposed Experiments." (Brown/RL. Technical Note R-160. November 1965.) [folder 1 of 3] |
6 | [folder 2 of 3] |
7 | [folder 3 of 3] |
8 | Research Program on Radio Astronomy and Plasma for AAP Lunar Surface Missions. Final Report. (NAA/SID. SID 66-381. 31 May 1966.) Volume III: Research and Technology Implications. |
| 103 | 1 | "Experiment Requirements Document." [Volume VIII: Space Station Development]. (Martin. [January 1967].) [incomplete; folder 1 of 3] | 2 | [incomplete; folder 2 of 3] |
3 | [incomplete; folder 3 of 3] |
4 | Volume X: Lunar Surface Experiments. (Martin. 18 January 1967.) |
5 | "Experimenter's Design Handbook for the Manned Lunar Surface Program." (Robert A. Fuchs; Hughes for MSFC. SSD 60352R. January 1967) | 6 | Applications A and B Phase B Integration Study Document. Applications A Experiment Descriptions and Requirements. (Applications A and B Phase B Integration Task Group, MSC. April 1967.) |
| 104 | 1 | Applications B Experiment Descriptions and Requirements. (Applications A and B Phase B Integration Task Group, MSC. April 1967.) | 2 | "A Program Analysis for Lunar Exploration." (JPL/ALST. 760-5. July 25, 1967) |
|
Subseries III.D.4.d. Logistic Systems The materials in this subseries relate to the transportation and/or storage of astronauts, equipment, and supplies to and from earth and lunar orbit and the lunar surface. | ||
| 104 | 3 | "Supply Truck to the Moon." (D. H. Dickson, GE/MSD. [c.1962) | 4 | "Design Feasibility Study - Crew Stay-Time Extension Payload (CRESTEP)." (L. Aasen, J. Belton, C. Browning, I. Drut, W. Heath, N. LeVora, and J. Renhult; Garrett/ARMD. SS-885-R. January 14, 1963.) [folder 1 of 2] |
5 | [folder 2 of 2] |
6 | "Advanced Lunar Transportation Systems." (Thomas Ray Salter; LTV/AD. American Astronautical Society Preprint 64-20. May 1964) | 7 | Minimum Cost Launch-of-Opportunity Module Study. Apollo Extension System 1400 Cubic Foot Module [presentation graphics]. (Boeing. D2-84051-1. [c.1966]) |
8 | Cryogenic Storage System Study (AES Payloads) Program. Summary Technical Report Covering Period February 1 through August 1, 1966. (Boeing/AG/SD. D2-113345-1. No date.) |
9 | Detailed Technical Final Report Covering Period February 1 through August 1, 1966. (Boeing/AG/SD D2-113345-2. No date.) |
| 105 | 1 | Advanced Logistics Spacecraft System Study. Final Report. (MDC/MAC. F738. 31 October 1967.) Volume II: Spacecraft Design and Performance Summary. | 2 | Volume III: Mission and Spacecraft Performance Analysis. |
3 | Volume IV: Spacecraft Design Analysis and Spacecraft Selection. |
4 | Volume V: Subsystems and Weight Analyses. [folder 1 of 3] |
5 | [folder 2 of 3] |
6 | [folder 3 of 3] |
| 106 | 1 | Volume VI: Mission Reliability, Crew Safety and Rescue. | 2 | Volume VII: Operational Support. |
3 | Volume VIII: Program Development and Costs, and Study Results. |
4 | Volume IX: Mars Return Analysis. |
5 | "The TALL [Titan-Agena Lunar Logistics] System - A Lunar Logistics Supplement to Apollo" [presentation graphics]. (LAC/LMSC. November 21, 1967) | 6 | "HOSS [Delta Hydrogen-Oxygen Second Stage] for Lunar Delivery" [presentation graphics]. (DAC/MSSD. January 1968) | 7 | Improved Lunar Cargo and Personnel Delivery System Study. First Interim Presentation presentation graphics]. (LAC/LMSC. LMSC-A848420. 19 September 1967.) |
8 | Second Interim Presentation [presentation graphics]. (LAC/LMSC. LMSC-A848420. 13 December 1967. |
9 | Final Presentation [presentation graphics]. (LAC/LMSC. LMSC-A922814. 20 March 1968.) |
10 | Final Report. (LAC/LMSC. T-28-68-4. 28 June 1968.) Volume I: Management Summary. |
11 | Volume II: Study Summary. |
| 107 | 1 | Volume IIIA: Conceptual Designs and Subsystem Analyses. [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Volume IV: Design Evolution and Performance Studies. |
4 | Volume V: Evolutionary Development Plan. |
5 | Volume VI: Supporting Research and Technology Requirements. |
6 | Study of Integral Launch and Reentry Vehicle System. Technical Review [presentation graphics]. (NAR/SD. SP 69-11. May 1, 1969.) |
7 | Final Report. (NAR/SD. SD 69-758. December 1969.) Technical Report - First Phase. |
|
Subseries III.D.4.e. Lunar Surface Projects The materials in this subseries relate to projects and studies for manned exploration of the lunar surface. For items relating to unmanned projects, see subseries IV.E.2.a. (Planetary Reconnaissance - Moon) and IV.E.3. (Planetary Reconnaissance - by Project). The materials in this subseries are organized by the general area of activity. Within each subseries documents are arranged chronologically by study unless otherwise noted. | ||
|
Subseries III.D.4.e.1. General This subseries consists of documents relating to lunar surface exploration but not specifically involved with base or vehicle concepts. | ||
| 108 | 1 | Initial Concept of Lunar Exploration Systems for Apollo. [Final Report.] (Boeing/ASD for NASA. CR-55765. No date.) Volume II: System Considerations. | 2 | Volume III Part 1: Subsystem Analysis and Module Configuration. (CR-55763.) |
3 | Part 2: Subsystem Analysis and Module Configuration. (CR-55764.) |
4 | Communications and Control - Lunar Exploration Systems for Apollo. Final Study Report. (Westinghouse/DSC/SOD. March 1965.) Volume 1: Report Summary. (SO-113.) |
5 | Volume 2: Technical Report. (SO-114.) |
6 | Volume 3: Research and Technology Implications. (SO-115.) |
7 | LEM Utilization Study. Final Presentation [presentation graphics]. (15 July 1965.) |
8 | Study of Emplaced Lunar Scientific Station for Apollo Extension Systems. Phase II Presentation - Preliminary Design [presentation graphics]. (Westinghouse/DSC/SOD. SO-218. April 1966.) |
| 109 | 1 | [Final Report.] Volume 1: Final Technical Report Part 1 (SO-240.) [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Part 2 (SO-241.) [folder 1 of 2] |
4 | [folder 2 of 2] |
5 | Volume 2: Summary Report (SO-242.) |
6 | Volume 3 Research and Technology Implications (SO-243.) |
7 | MIMOSA [Study of Mission Modes and Systems Analysis for Lunar Exploration]. [Interim Report.] (LAC/LMSC. LMSC-A820749. 30 June 1968.) Volume II: Lunar Exploration Concept Development and Alternative Mode Definition for the 1970-1980 Timeframe. Addendum 2, Part 3. |
8 | Study of an Electrical Power System for Support of a 12-Man Lunar Base. (GE/MSD/ANSO. 67SD2006. c.1967.) |
| 110 | 1 | Final Report. (LAC/LMSC. 30 April 1967.) MIMOSA Summary Digest. (LMSC-A847940.) | 2 | MIMOSA Summary Technical Report. (LMSC-A847941.) |
3 | MIMOSA Technical Report. (LMSC-A847942.) Volume I: Lunar Exploration Equipment and Mode Definition. |
4 | Volume II: Candidate Lunar Exploration Programs. |
5 | Volume III: Recommended Lunar Exploration Plan. |
6 | MIMOSA Planning Methodology. (LMSC-A847943.) Volume I: Planners Handbook (Except Appendices K and L). |
7 | Volume III: Scientific Programs. |
8 | "Development of a Subsurface Drill System for Post-Apollo Missions." (Westinghouse/DSC. March 1967) |
| 111 | 1 | "Lunar Mission Planning Data Book." (MSC/LMO. July 1967) |
|
Subseries III.D.4.e.2. Lunar Base Concepts The materials in subseries relate to manned shelters on the lunar surface other than the Apollo Lunar Module. | ||
| 111 | 2 | Initial Concept for a Lunar Base. Midterm Progress Report. (Boeing/ASD. D2-100055. September 15, 1963.) [folder 1 of 2] | 3 | [folder 2 of 2] |
4 | Lunar Applications of a Spent S-IVB/IU Stage (LASS). [presentation graphics]. (DAC/MSSD. PP158. September 1966.) |
5 | [Report.] (L. O. Schulte and D. E. Davin, DAC/MSSD. DAC-56365P. September 1966.) [folder 1 of 2] |
6 | [folder 2 of 2] |
7 | "Five-Day Lunar Shelter and Extravehicular Manned Test." (LAC/LMSC. 6-71-67-3. June 1967) |
| 112 | 1 | Early Lunar Shelter Design and Comparison Study. Final Report. (Garrett/ARMD. [c.July 1967].) Volume 1: Summary. (67-1964-1, Part 1.) Book 1: Management Summary. | 2 | Volume 1: Summary. (67-1964-1, Part 2.) Book 2: Technical Summary. |
3 | Volume 2: Mission Timelines and Requirements. (67-1964-2.) |
4 | Volume 3: Subsystems. (67-1964-3. Part 1.) Book 1: Electrical Power. Book 2: Environmental Control/Life Support. |
5 | Volume 3: Subsystems. (67-1964-3, Part 2.) Book 3: Fluid Containment. Book 4: Thermal Control. Book 5: Astrionics. |
6 | Volume 4: System Integration and Configuration Design. (67-1964-4.) |
7 | Volume 5: Resource Plan. (67-1964-5.) |
8 | Volume 6: Supporting Studies. (67-1964-6.) Book 1: Structural Design and LM/T Integration. Book 2: Review of Scientific Mission Requirements. Book 3: Hassle Analysis of Proposed Schedule. [folder 1 of 2] |
| 113 | 1 | [folder 2 of 2] | 2 | Design Requirements for Reactor Power Systems for Lunar Exploration. [Final Report.] (LAC/LMSC. LMSC-677879. September 1967.) Volume I: Summary Final Report. (LMSC-677879-I.) |
3 | Volume II: Final Report. (LMSC-677879-II.) [folder 1 of 3] |
4 | [folder 2 of 3] |
5 | [folder 3 of 3] |
6 | "Preliminary Study of Lunar Bases" [presentation graphics]. (Benjamin Milwitzky; NASA Headquarters. [c.1969) | 7 | "Long Term Lunar Missions Using Apollo Hardware Derivatives" [SLA Mini-Base presentation graphics]. (NAR/SD. PD 69-163. November 1969.) "Long Term Lunar Missions Using Apollo Hardware Derivatives" [SLA Mini-Base presentation graphics]. (NAR/SD. PD 69-163. revised January 1970) |
8 | "Lunar Exploration Planning" [SLA Mini-Base presentation graphics]. (NAR/SD. PD 69-164. November 1969) | 9 | SLA Mini-Base Concept for Extended Lunar Missions. [Final Report.] (NAR/SD. SD 70-516. September 1970.) Volume I: Summary. |
| 114 | 1 | Volume II: Crew Considerations and Systems Analysis. | 2 | Volume III: Mission Considerations and Spacecraft Performance. |
3 | The SLA Mini-Base [presentation graphics]. (NAR/SD. [c.1971].) |
|
Subseries III.D.4.e.3. Lunar Surface Vehicle Concepts The materials in this subseries relate to the design of surface vehicles for use in lunar exploration. | ||
| 114 | 4 | "Manned Lunar Auxiliary Vehicle." (Chrysler/DSG. 6 December 1963) | 5 | Lunar Surface Vehicles as Part of LESA. Final Report [presentation graphics]. (Boeing/ASD. June 1964.) |
6 | Analysis of Lunar Surface Vehicles for Lunar Exploration Systems for Apollo. Final Report. (Boeing/ASD. D2-100134-1. July 15, 1964.) Volume I: Technical Study. |
7 | Apollo Logistics Support System Payloads - Preliminary Design Study. Final Report. (Bendix/BSD. ALSS-TR-013; BSR-1119; BSC-45336. June 1965.) Condensed Summary Report. |
8 | Volume I: Program Summary. |
| 115 | 1 | Apollo Logistics Support System Payloads. Interim Report [presentation graphics]. (Boeing/ASD. D2-36072-1. September 1964.) [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Final Presentation. (Boeing/ASD. D2-36072-3. April 1965.) Volume 2 [presentation graphics]. [folder 1 of 2] |
4 | [folder 2 of 2] |
5 | Summary Report. (Boeing/ASD. D2-36072-3. June 1965.) |
6 | MOLAB Astrionic Systems - Navigation and Guidance. (Boeing/ASD. D2-83205-1. June 1965.). [folder 1 of 3] |
7 | [folder 2 of 3] |
| 116 | 1 | [folder 3 of 3] | 2 | MOLAB Astrionic Systems - Communications, Command and Control. (Boeing/ASD. D2-83205-2. June 1965.) Volume 1. [folder 1 of 3] |
3 | [folder 2 of 3] |
4 | [folder 3 of 3] |
5 | Volume 2. [folder 1 of 3] |
6 | [folder 2 of 3] |
7 | [folder 3 of 3] |
| 117 | 1 | Lunar Surface Mobility Systems Comparison and Evaluation (MOBEV) Study [Proposal.] (Bendix/BSD. BSD 1034. October 1965.) | 2 | Preliminary Design Study of a Lunar Local Scientific Survey Module (LSSM). Final Summary Report. (Boeing/SD. D2-83010-1. June 1966.) |
3 | Final Technical Report: System Analysis, Design Integration, Thermal Control, and Power System Design. (Boeing/SD. D2-83011-1. June 1966.) [folder 1 of 4] |
4 | [folder 2 of 4] |
5 | [folder 3 of 4] |
6 | [folder 4 of 4] |
7 | Final Technical Report: Mobility System Analysis and Design. (GM/DRL (TR66-17) for Boeing/SD. D2-83012-1. June 1966.) [folder 1 of 3] |
| 118 | 1 | [folder 2 of 3] | 2 | [folder 3 of 3] |
3 | Final Technical Report: Navigation System Analysis and Design. (GM/AC (EP66-109) for Boeing/SD. D2-83013-1. June 1966.) |
4 | Final Technical Report: Telecommunications System Analysis and Design. (RCA/AED for Boeing/SD. D2-83014-1. June 1966.) |
5 | Final Technical Report: Life Support Subsystem Analysis and Design. (Garrett/ARMD (66-0473) for Boeing/SD. D2-83015-1. June 1966.) |
6 | System Functional Specification. (Boeing/SD. D2-83016-1. June 1966.) |
7 | Research and Advanced Technology. (Boeing/SD. D2-83017-1. June 1966.) |
8 | Program Plan. (Boeing/SD. D2-83018-1. June 1966.) |
| 119 | 1 | Program Cost. (Boeing/SD. D2-83018-2. June 1966.) [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Preliminary Design Study of a Lunar Local Scientific Survey Module (LSSM). Final Report. (Bendix/BSD. BSR 1287. July 1966.) Volume II. Book 9: Systems Analysis. |
4 | Preliminary Design Study of a Lunar Gravity Simulator. First Interim Report. (LAC/LMSC/HREC. LMSC/HREC A783082. 29 July 1966.) |
5 | Second Interim Report. (LAC/LMSC/HREC. LMSC/HREC A783245. 6 September 1966.) |
6 | Third Interim Report. (LAC/LMSC/HREC. LMSC/HREC A783335. 25 October 1966.) |
7 | Final Report. (LAC/LMSC/HREC. LMSC/HREC A783336, HREC 0351-1. November 1966.) |
8 | Condensed Summary Report. (LAC/LMSC/HREC. LMSC/HREC A783968, HREC 0351-2. March 1967.) |
9 | Engineering Design Test of Mobility Test Articles (MTAs). Block I Test Plan. (F. E. Northon; USATEC/YPG. July 1966.) |
10 | Engineer Design Test of Mobility Test Articles - Models BX-1 and GM-1. Supplement to Final Report: MTA Terrain Identification. (F. E. Northon; USATEC/YPG. YPG Report 7010. June 1967.) |
11 | Engineer Design Test (Block I) of Mobility Test Article, Model BX-1. Final Report. (F. E. Northon; USATEC/YPG. YPG Report 7011. June 1967.) |
12 | Summary Test Report. (F. E. Northon; USATEC/YPG. YPG Report 7015. July 1967.) |
13 | Engineer Design Test of Mobility Test Article, Model GM-1. Final Report. (F. E. Northon; USATEC/YPG. YPG Report 7022. November 1967.) |
14 | Summary Test Report. (F. E. Northon; USATEC/YPG. YPG Report 7025. December 1967.) |
| 120 | 1 | Specified LSSM Design Study. [Boeing] Technical Report. (Boeing/SD. D2-113471-2. November 1966.) Volume 1: LSSM Vehicle and Subsystems Analysis and Design. [folder 1 of 4] | 2 | [folder 2 of 4] |
3 | [folder 3 of 4] |
4 | [folder 4 of 4] |
5 | Volume 2: LSSM Vehicle Performance Improvement Analysis. |
6 | Resources Plans. (Boeing/SD. D2-113471-3. November 1966.) Volume 1: Resources Plan. [folder 1 of 2] |
| 121 | 1 | [folder 2 of 2] | 2 | Volume 2: Test Plan. |
3 | Specified LSSM Supplemental Studies. Condensed Summary Report. (Boeing/SD. D2-114082-3. October 1967.) |
4 | Specified Local Scientific Survey Module (LSSM) Design Study. [Bendix] Final Report. (Bendix/ASD and LAC/LMSC. BSR 1495. February 1967.) Volume I: Program Summary. |
5 | Volume II: Technical Report Book 1: Specified LSSM Detailed Design. [folder 1 of 4] |
6 | [folder 2 of 4] |
7 | [folder 3 of 4] |
8 | [folder 4 of 4] |
9 | Book 2: Appendix A (Thermal Analysis). |
| 122 | 1 | Book 3: Appendix B (Specified LSSM Interfaces). | 2 | Book 4: Appendix C (Operations Analysis). |
3 | Book 5: Appendix D (Vehicle Analysis). |
4 | Book 6: Appendix E (Human Factors Analysis). |
5 | Book 7: Appendix F (Communications Analysis). |
6 | Book 8: Appendix G (Navigation Analysis). |
7 | Volume III: Resources Plan. Book 1: Summary Program Plan. |
8 | Book 2: Development and Production Plans. [folder 1 of 3] |
9 | [folder 2 of 3] |
10 | [folder 3 of 3] |
| 123 | 1 | Book 4: Development Plan for Performance Improvement Items. | 2 | Additional Tasks Final Presentation Brochure [presentation graphics]. (Bendix/ASD. BSR 2195. September 1967.) |
3 | Additional Tasks Final Report. (Bendix/ASD. BSR 2162. October 1967. Volume I: Condensed Summary. [2 copies] |
4 | Volume II: Book 1: Interface Analysis and Integration Support Study. |
5 | Book 2: Test and Simulation Program Study. |
6 | Book 3: Mobility Performance Enhancement Study. |
7 | Nutator Drive Experimental Test Program Final Report. (Bendix/ASD. BSR 2192. October 1967.) Volume I: Condensed Summary. |
8 | Volume II. |
9 | Human Factors Visual Simulation Study. Final Report. (NAA/SID. SID 67-288. April 1967.) |
| 124 | 1 | Lunar Wheel and Drive Experimental Test Program. Final Report. (GM/AC-DRL/LPP. TR67-18. June 1967.) Volume I: Summary Technical Report. | 2 | Volume II: Detailed Technical Report. [folder 1 of 5] |
3 | [folder 2 of 5] |
4 | [folder 3 of 5] |
5 | [folder 4 of 5] |
6 | [folder 5 of 5] |
7 | Volume III: Task 7.0 - Lunar Roving Vehicle Drive System Analysis. |
8 | "Prospects for a Lunar 'Field Assistant.'" (JPL. 760-7. July 19, 1967) |
| 125 | 1 | Graphics for Presentation on Lunar Surface Vehicle Design]. (GM/AC. [c.1968) | 2 | "Lunar Surface Mobility Systems Technology Summary" [presentation graphics]. (Bendix/ASD. BSR 2313. 28 May 1968) | 3 | "Investigation of a Hopping Transporter Concept for Lunar Exploration." (Marshall H. Kaplan and Howard W. Seifert; Dept of Aeronautics and Astronautics, Stanford University. SUDAAR 348. June 1968) | 4 | Dual-Mode (Manned/Automated) Lunar Roving Vehicle Design Definition Study. First Monthly Program Progress Review [presentation graphics]. (Bendix/ASD. BSR 2708. May 1969.) |
5 | Final Report. (Bendix/ASD. BSR 2816. January 1970.) Volume II: Vehicle Design and Systems Integration. Book 1: DLRV System Design and Analysis. [folder 1 of 3] |
6 | [folder 2 of 3] |
7 | [folder 3 of 3] |
8 | Book 2: DLRV Tiedown, Off-Loading, and Checkout. |
| 126 | 1 | Book 3: Ground Support Equipment. | 2 | Book 4: Systems Safety Analysis. |
3 | Volume III: Astrionics Systems. Book 1: Navigation Subsystem Design and Analysis. |
4 | Book 2: Communications Subsystem Design and Analysis. |
5 | Book 3: Hazard Detection Subsystem Design and Analysis. |
6 | Book 4: Control Subsystem Design and Analysis. |
7 | Book 5: Power Subsystem Design and Analysis. |
8 | Volume IV: Scientific Systems. Part 1: Scientific Equipment Interface Design and Analysis. Part 2: Engineering Techniques for Determining Engineering Properties of the Lunar Surface. |
| 127 | 1 | Volume V: Mission Operations. [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Volume VI: Growth Capability of DLRV. |
4 | Volume VII: DLRV Systems Specification. |
5 | "Science Imaging and Sampling Requirements for a Dual-Mode Lunar Rover: A Questionnaire." (R. Ward, J. Conley, and L. Jaffe; JPL. 760-52. April 1970) | 6 | Performance Evaluation of Wheels for Lunar Vehicles. Summary Report. (USAEWES. Misc Paper M-70-4. May 1970.) |
|
Subseries III.D.4.e.4. Lunar Flying Vehicle Concepts The materials in this subseries relate to the theory and design of flying vehicle for use in lunar exploration beyond the ascent/descent operations capable by the Lunar Module. | ||
| 127 | 7 | Study of Lunar Launch Ascent Trajectory Control Employing Simple Manual/Visual Control Techniques. Proposal for. (Bell/BAC. D7190-953001. April 1963.) | 8 | [Report.] (Bell/BAC. D7190-950001. July 1963.) |
9 | An Engineering Study and Preliminary Design of a Lunar Escape Device. Proposal. (Bell/BAC. D7195-953001. July 1963.) |
| 128 | 1 | An Engineering Study and Preliminary Design of a One Man Propulsion Device for Lunar and Free-Space Environments. Final Report. (UAC/HS. May 21, 1964.) [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | A Study of Lunar Flying Vehicles. Lunar Flying Vehicle Optimization Study. (Bell/BAC. 7217-902002. June 1965.) |
4 | Final Report. (Bell/BAC. 7217-928001. June 1965.) |
5 | Summary. (Bell/BAC. 7217-950001. June 1965.) |
6 | Study of Manned Flying Systems. Mid-Term Report. (Bell/BAC. 7243-950001. November 1965.) Volume I: [Vehicle and Subsystem Studies] |
7 | Volume II: [Mission Analysis] |
| 129 | 1 | Final Report. (Bell/BAC. 7243-950002. June 1966.) Volume I: Vehicle and Subsystem Analysis. | 2 | Volume II: Mission Analysis. |
3 | Summary. (Bell/BAC. 7243-950003. June 1966.) |
4 | Research and Technology. (Bell/BAC. 7243-920001. June 1966.) |
5 | Low Thrust Throttleable Engine for the Lunar Manned Flying System. Resources Plan. (TRW/SG. 9990-7222-R0000. 28 February 1966.) [folder 1 of 2] |
6 | [folder 2 of 2] |
7 | Lunar Manned Flying System Radar Altimeter. Resources Plan. (Westinghouse/DSC. 30 April 1966.) |
8 | "Presentation on Lunar Surface Rescue and Escape" [presentation graphics]. (Bell/BAC. 7296-953001. c.1967) | 9 | Flight Test of a One Man Flying Vehicle. Summary Report. (Bell/BAC. 2330-950001. July 1967.) [2 copies] |
10 | Final Report. (Bell/BAC. 2330-95002. July 1967.) Volume I: Flight Test Program. [2 copies] |
11 | Volume II: Mission Applications Studies. [2 copies] |
| 130 | 1 | Study of a One Man Lunar Flying Vehicle. Final Report. (Bell/BAC. 7335-950010. July 1969.) Part 1. [folder 1 of 2] | 2 | [folder 2 of 2] |
3 | Part 2. |
|
Subseries III.D.4.f. Lunar Orbital Program Studies The materials in this subseries concern experiments to be conducted in lunar orbit. | ||
| 130 | 4 | Lunar Reconnaissance Mission. [Report.] (AGC/SGC. SGC P-3505. March 1963.) Part 1. | 5 | Part 2. [folder 1 of 2] |
6 | [folder 2 of 2] |
7 | Lunar Orbital Survey Missions (LOSM) Study. Final Report. (Lockheed/LMSC. LMSC-A842063. 16 January 1967.) Volume I: Summary. |
8 | "Lunar Orbit Science - Summary Briefing" [presentation graphics]. (NAR/SD. PD 68-64. December 1968 rev. January 1969) |
|
Subseries III.D.4.g. Earth Orbital Program Studies/Skylab The material in this subseries relates to studies intended to lead to Earth orbital missions utilizing Apollo hardware. Included in this material are documents pertaining to Saturn Orbital Workshop development, which became the Skylab program in February 1970. Documents pertaining to other space station development, including the Manned Orbital Research Laboratory (MORL) are filed under subseries III.D.5. (Space Station Program). | ||
| 131 | 1 | Study of Orbital Launch Operations. Interim Progress Report. (CVC/VA. TP 64003. 11 June 1961.) Volume II: Design Data. [folder 1 of 4] | 2 | [folder 2 of 4] |
3 | [folder 3 of 4] |
4 | [folder 4 of 4] |
5 | Study of a Manned Orbital Laboratory, Saturn V Class. Planning Analysis. Tooling Report. (Douglas/MSSD. ATE 709. January 6, 1964.) [folder 1 of 2] |
6 | [folder 2 of 2] |
7 | Extended Apollo Systems Utilization Study. Final Report. (NAA/SID.) Volume 13: The Adaptation of the Apollo Reaction Control System Propellant Tanks for Apollo X Missions. (Bell/BAC (D8404-953001) for NAA/SID. SID 64-1860-13. 16 November 1964.) |
| 132 | 1 | Addendum 1 (NAA/SID.) Volume 2: Experiment Analysis and Requirements. Appendix A: NASA Experiments. (SID 65-500-2D. No date.) Book 2. [folder 1 of 3] | 2 | [folder 2 of 3] |
3 | [folder 3 of 3] |
4 | Volume 3: Configuration Analysis and Experiment Accommodation. Appendix A: Engineering Drawings. (SID 65-500-3B.) [folder 1 of 4] |
5 | [folder 2 of 4] |
6 | [folder 3 of 4] |
7 | [folder 4 of 4] |
| 133 | 1 | Systems Study of a Manned Orbital Telescope. Midterm Report [presentation graphics]. (Boeing/ASD. D2-90747-1. May 1965.) | 2 | Advanced Orbital Launch Operations Study. Phase B Final Report. (LTV/AD. 00.676. 1 November 1965.) Volume I: Summary Technical Report. |
3 | ORL [Orbital Research Laboratories] Experiment Program Study. Contractor Report. (IBM/FSD. 21 February 1966.) Volume A: Framework for Synthesis. |
4 | Volume B. Part I: Agriculture/Forestry. |
5 | Part II: Geology/Hydrology. |
6 | Part III: Oceanography/Marine Technology. |
7 | Part IV: Geography. |
| 134 | 1 | Part V: Atmospheric Science and Technology. | 2 | Part VI: Communications and Navigation/Traffic Control. |
3 | Part VII: Biomedicine/Behavior. |
4 | Part VIII: Advanced Technology and Supporting Research. |
5 | Part IX: Operations Techniques and Advanced Missions Spacecraft Subsystems. |
6 | Part X: Extravehicular Engineering Activities. |
| 135 | 1 | Part XI: Astronomy/Astrophysics. | 2 | Part XII: Bioscience. |
3 | Part XIII: Physical Sciences. |
4 | Volume C: Guidelines for Comprehensive Flight Program. |
5 | Annex 1. |
6 | Annex 2. |
| 136 | 1 | Volume D: Summary of Results. | 2 | Volume E: Bibliographical References for Illustrations and Tables. (15 May 1966.) |
3 | "S-IVB Role in the Saturn V Synchronous Mission" [presentation graphics]. (Douglas/SSC. PP 156. August 1966) | 4 | Optical Technology Apollo Extension System Study. Phase A Final Technical Report. (Chrysler/SD. [c.1967].) Summary Report. |
5 | Experiments for Satellite and Material Recovery from Orbit Study Program. Final Report. (BBRC. F67-05. 1 March 1967.) Volume I: Summary. |
6 | Volume II: Technical. |
7 | "Preliminary Data Specification Document for Missions AAP-1a, AAP-1/AAP-2, and AAP-3/AAP-4." (MSC/ATSO. June 19, 1967) | 8 | "Radiation Characteristics of Photographic Film for Use in Apollo Application Experiments." (Lockheed/LMSC. LMSC 4,900,226. 30 June 1967) | 9 | "Environmental Thermal Control and Life Support Systems Definition for the Short-Term and Long-Term Earth Resources Experiment Carriers." (MSC. NASA General Working Paper 10 074. July 17, 1967) | 10 | "S-II/Saturn V for AAP" [briefing charts]. (NAA/SD. PD 67-38. August 1967. | 11 | S-IVB Station Module Study. Technical Summary. (Douglas/MSSD. DAC-56554. November 1967.) [photocopy] |
| 137 | 1 | Experiments Program Report. (Douglas/MSSD. DAC-56556. November 1967.) [photocopy] | 2 | -Advanced Workshop in Low Orbit C. (Douglas/MSSD. November 1967.) Technical Report. (DAC-56548.) [photocopy] |
3 | Development Plan, Final Report. (DAC-56549.) [photocopy] |
4 | -Early Orbital Space Station (EOSS). (Douglas/MSSD. November 1967.) Technical Report. (DAC-56550.) [photocopy] [folder 1 of 2] |
5 | [folder 2 of 2] |
6 | Resources Analysis. (DAC-56553.) [blueprint copy] |
| 138 | 1 | Research and Technology Report. (DAC-56555.) [blueprint copy] | 2 | -Oceanography and Meteorology: A Systems Analysis to Identify Orbital Research Requirements. [Report.] (Douglas/MSSD. April 1968.) Volume I: Executive Summary Report. (DAC-58120.) |
3 | Volume II: Technical Report. (DAC-58121.) [folder 1 of 3] |
4 | [folder 2 of 3] |
5 | [folder 3 of 3] |
6 | Saturn V Workshop Study. [Report.] (MSC/OMSFPG.) Volume I: Summary. (May 15, 1968.) [2 copies] |
7 | Volume II: Task Team Analysis. (April 1, 1968.) |
8 | Saturn V Orbital Workshop Study. [Report.] (MSC/MATT.) Appendices. (July 1, 1968.) [folder 1 of 2] |
| 139 | 1 | [folder 2 of 2] | 2 | Habitability Study - Earth Orbital Space Stations [AAP Habitability Report]. Final Report. (Raymond Loewy/William Snaith Inc. 31 December 1968.) |
3 | "Apollo Telescope Mount Extravehicular Activities - Astronaut Review Outline." (MSFC/MSS. July 1, 1969.) [preliminary unchecked data] | 4 | "Apollo Telescope Mount Extravehicular Activities - Crew Station Review." (MSFC/MSS. July 1, 1969, Revision A. | 5 | "Airlock Design Data Book." (MDC/MDAC/ED. 15 November 1969.) [photocopy] | 6 | "Skylab Program - Technical Summary." (NASA/OMSF. June 1970) | 7 | "Skylab Command Module (CM) Uprighting Bag Pack Assembly Verification Test." (NAR/SD. SD 70-299. October 1970) | 8 | Skylab B - Earth Resources, Artificial Gravity, Bioscience Experiments. [Report.] Volume II: Artificial Gravity Experiment Crew Deck Design. (MSC. MSC-EA-R-71-1. February 1971.) |
9 | "Skylab Program - Failure Mode and Effects Analysis for Sleep Monitoring System (M133)." (MMC/DD for MSC. MSC-02942. April 22, 1971) | 10 | "Skylab Program - Skylab In-Flight Experiments - Summary Descriptions" [presentation graphics]. (MSFC. June 1971) |